Boldrewood

project overview

NA CWL was initially awarded the installation contract for Red Architectural Ltd, but following their untimely demise, NA CWL completed the contract directly for main contractor, Wates. Works included the installation of the main facade and the design, supply & installation of Schuco curtain walling. In addition, NA CWL was also contracted to design, supply & install the brise soliel system, along with steel walkways, Schuco ground floor glazing and the louvred plant room areas. This challenge was achieved by working very closely with Wates to ensure build-ability, whilst adhering to the demands of the programme. The success of this project represents a prime example of the dedication, commitment and collaborative approach of NA CWL in delivering the best possible outcome for its clients.